How it was covered

  • BBC One was the only channel found covering it.
  • Channel 5, BBC News, BBC Two, Channel 4, GB News, ITV and Sky News: not found in tracked broadcasts.

The Full Story

A plain summary built from the channels that reported this story. Facts only one channel reported are attributed to it.

Hinkley Point B in Somerset has been handed over for decommissioning after decades of generating electricity. The station stopped generating, its nuclear fuel has been removed, and it has passed from EDF to a government-owned company. That company will oversee dismantling, a process expected to take 85 years.

The plant was built in the 1960s and began generating electricity in the early 1970s. It employed generations of Somerset families. One worker described being a third-generation Hinkley worker: his grandfather helped build it in the 1950s, his father helped run it in the 1970s, and he joined in 2007 to help take it apart.

Decommissioning will follow what is described as a managed retreat. Buildings outside the reactors will be removed, a structure will be put around the reactors, and the site will be left for 85 years. The aim is that dismantling will be easier when crews return. In total, the work is expected to take about 100 years, taking the site back to brownfield land.

The turbine has already gone. Useful components from it have been sent to other sites across the UK so they can keep generating power. In the deepest part of the station, pipes that once carried hot water and steam to the turbine are now cold. They will be slowly dismantled over the coming years.

The last director at Hinkley B said the site had produced electricity for years and was now moving into decommissioning. He said the handover might feel like the end, but it was the beginning of the last chapter for Hinkley B.

Key Claims

Claims reported during this story's coverage, grouped by how many channels reported each one. Select a dot to see the source excerpt.

Claim
Only on one channel
Hinkley Point B ceased electricity generation and had its nuclear fuel removed.
Hinkley Point B transferred from EDF to a government-owned company that will oversee dismantling expected to take 85 years.
Useful components from Hinkley Point B were sent to other UK sites to continue generating power.

Channel Perspectives

What each channel focused on, with key quotes.

BBC ONE West led with a local reporter package from Hinkley Point B, focusing on the human side of the handover and the long timetable. It showed the quiet site, the removed turbine and cold pipework, and explained the managed retreat approach. The tone was reflective, with the station's workforce history given as much weight as the technical process.

Key Quotes:
  • “It's what we call a managed retreat. We get rid of all of the buildings outside, put a structure around the reactors and leave them for a period of 85 years until we can come back at that time and it's much easier to dismantle and decommission.”
  • “I'm a third-generation Hinkley worker. My granddad came out in the 50s to help build it. My dad came out in the 70s to help run it, and I joined in 2007 to help start taking them apart.”
  • “I am the last director as we move into the next phase of decommissioning.”

Broadcast Timeline

News broadcasts tracked for this story, in time order.

BBC News at One including

BBC One, BBC News at One including, 1 October 2026